Status Completed
Heritage P. Wogan, 1990s
The 2024 master plan

A 1990s Wogan hole, brought into the Bass Rocks vernacular.

Hole 7 was originally built in the 1990s by Philip Wogan as part of a rerouting that created the current 7th, 8th, and 9th. The hole always had an intriguing par-5 profile — a raised green, rock outcroppings, interior fairway mounding — but it lacked the rugged, old-school character that defines the rest of Bass Rocks.

The reconstruction was prioritized as one of two high-value early projects in the 2024 master plan. The brief: rebuild the green complex for more strategic and aesthetic interest, lengthen the hole to meet modern distances, and bring the surrounding rock and turf into the framing of the shots.

Work was completed in 2024. The seventh now reads as a Bass Rocks hole first — exposed rock, native ground, harder edges — and a Wogan hole second.


The seventh, as it was

A par 5 with bones, but the wrong character.

Two reference photographs of the hole before reconstruction. The raised green and the surrounding rock were always interesting, but the bunkering had drifted away from the Bass Rocks vernacular, the green sloped in a way that limited usable pin positions, and the native rock — the most distinctive feature of the seventh — was left largely outside the framing of the shots.

Hole 7 existing condition, view 1
Existing · approach to the seventh green
Hole 7 existing condition, view 2
Existing · alternate vantage

The plan, from above

Side by side, existing and proposed.

Drag the handle to compare the existing par-5 corridor against the proposed plan — a rebuilt green, repositioned bunkering, and stronger integration with the surrounding rock.

Hole 7 proposed bird's-eye Hole 7 existing bird's-eye Existing Proposed
Drag to compare · bird's-eye renders, existing vs proposed plan

What changed

A coordinated set of moves on a coastal par 5.

The corridor stays where Wogan left it, but the green complex, the surrounding bunkering, and the framing of the natural rock have all been reimagined. The result is a par-5 that finally plays like the rest of Bass Rocks.

  1. A
    New green complex Complete reconstruction of the green to add interior contour, increase usable pin positions, and offer real strategic variety in the approach.
  2. B
    Added length The hole was extended to meet modern par-5 distances without compromising the playing experience for shorter hitters.
  3. C
    Native rock as framing Surrounding rock outcroppings, long a quiet feature of the property, are now exposed and worked into the framing of the green and the approach.
  4. D
    Restyled bunkering Greenside and lay-up bunkers reshaped to match the harder-edged, old-school aesthetic that defines the rest of Bass Rocks.
  5. E
    Surrounds and recovery Expanded short grass and reworked surrounds give players more options for recovery while sharpening the line between bold play and safe play.

Design sheet

The plan, drawn at scale.

The Hole 7 design sheet was the working document carried through construction. It locates the new green, fixes the rebuilt bunkering and lay-up zones, and registers the relationship between the corridor and the rock outcroppings to the right of the green.

Hole 7 design sheet
Hole 7 design sheet · 2024

Concept renderings

The hole as it would play.

Renderings produced during the design process depict the rebuilt green complex, the restyled bunkering, and the integration of native rock into the framing of the approach.

Hole 7 rendering, approach view
Plate 01 · Approach to the rebuilt green
Hole 7 rendering, alternate vantage
Plate 02 · Alternate vantage on the new complex

Construction

On site, summer 2024.

Frames from the build — careful shaping and earthmoving to realize the design intent while preserving the surrounding rock and turf.

Hole 7 mid-construction, view 1
Construction · shaping the new green complex
Hole 7 mid-construction, view 2
Construction · grading the surrounds

How it fixed the problems

Character, strategy, modern length.

The completed work answers the three issues identified above. The bunkering and finish now match the rest of the property, the rebuilt green gives the hole real strategic depth, and added length makes the seventh play meaningfully as a par 5 again.

01

Bass Rocks character

Restyled bunkering, exposed rock, and harder edges around the green tie the seventh to the rest of the property. The Wogan-era softness is gone; in its place, the rugged old-school presence that the rest of Bass Rocks has always had.

02

Strategic depth

The rebuilt green opens up pin positions that simply didn't exist before. The approach offers a real choice between aggressive line and safe miss — and the recovery options around the new complex reward the player who reads the ground.

03

Modern length

Added length brings the hole into line with how par-5s play today, without compromising the experience for shorter hitters. The lay-up still rewards a thoughtful angle, and the second shot for stronger players is meaningful again.

The seventh is now one of the most distinctive holes on the course — a Bass Rocks hole first, and a Wogan hole second.


In closing

One of two completed phases.

The seventh and the second were the first two holes completed under the 2024 master plan. Updated photography of the finished work will be added as the new turf matures.